Moving to Riverside East

It’s just a few weeks before the first part of Riverside East, our new building down at the Garthdee Campus, will be open for staff and students.  The Library is moving first and they plan to have moved out of the Aberdeen Business School and into the new building around the end of May. Sounds like they are having fun with red and green dots getting ready to move thousands of books – have a look at their blog.

We’re having fun too in IT Services, although we’re not quite seeing dots in front of our eyes yet. Before anyone can move into the new building we need to get all the IT equipment set up ready for staff and students to move in.

First priority is to build the IT network. All the cabling work has been done as part of the construction project, but what we have to do now is install all the network routers and switches which will drive the whole network across the building, and connect it up to the rest of the Campus. The network kit has been bought and the IT Engineers are on site to start the installation. It’s a complex process. The network equipment needs to be physically installed into the communications rooms and communications risers in the building, and thousands of cables need to be connected up to the correct network equipment. It’s essential that this is done systematically and neatly from the beginning to make access for future maintenance easy. Then it’s all got to be systematically configured and tested. The priority is to get everything ready for the Library first, but in order to do that much of the whole building network core needs to be done anyway. So in terms of sequencing, we’ll get the Library done first and then move on to the remainder of the building according to the move schedule for the Schools and Departments moving in. Because some of the construction work is still ongoing, health and safety is an important priority and all the IT engineers who will be working on site are going through formal safety training first.

Next come the IT workstations – approximately 400 are going into the Library space in time for it to open for students. There is a team of IT staff, ably assisted by some students from the School of Engineering, who are currently taking lots of workstations out of their boxes and cabling them up ready for installation in the new building. That’s fine, but of course you can’t put the workstations into the Library until there are desks to sit them on. So, all this IT work is actually now part of a very intensive programme of work to co-ordinate all the activities for the move into the building. The University has contracted with a company called Space Solutions and they are managing the overall programme of work – actually right down to scheduling the use of the lifts in the building. There’s no point in a bunch of IT guys arriving with hundreds of workstations and furniture guys with loads of desks and then fighting over who gets to use the lift. Just goes to show what level of detail has to be planned at this stage.

At the tail end of all of this there will be a fairly intensive period when the desks are going into the library, the workstations are going on the desks, are being connected up and tested, and somewhere round about this time thousands of books will be getting moved across and into their proper places on the shelves. Then of course there will be printers to install, and the self service issuing terminals for borrowers to use.

I’m sure it will look like an oasis of calm when the doors open and students go into the new building. Inevitably there will be some snagging at that stage, but spare a thought for a month of very hard work which will have preceded the opening!

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s