Well, it’s the 30th May 2013, and the Library staff and books have moved into the new Library Tower in Riverside East, and this is the first day that they’ve opened to staff and students.

In a recent post I explained what was involved in preparing the IT infrastructure behind the scenes, so this post is by way of an update and also a huge thanks. Many IT staff from IT Services and from the Faculty IT&AV team, have worked immensely hard over the last 2-3 weeks on fitting out all the IT facilities and I am grateful to their commitment in getting everything to this stage. Thanks also to staff from the Library, Estates and various contractors for their assistance.

With some final construction work still ongoing in the building, and furniture and book moves happening at the same time, it’s been a challenge to schedule everything and work around issues and snags that have been arising on a daily basis. But over the past few weeks the IT teams have commissioned the network infrastructure required to service the Library and front desk and deployed around 400 workstations into the Library ready for use. There are some last minute issues with power connections at the moment which are preventing the workstations from being powered on today but hopefully that will be resolved quickly and everything is then ready to go.

Now that the IT in the Library is finished, the IT teams will turn their attention to the rest of the building. There is a schedule over the summer for staff moving from the three Schools into the building and the IT teams will be working ahead of these moves to prepare the network and install workstations. Priority will be given to this, and the installation of IT equipment into the various teaching spaces in the building will fit around preparation for these staff moves. The IT network will also be required to support other functions in the building, such as the building management system which is used to manage a range of building services and that will be scheduled too.

Finally, the WiFi system also has to be installed in the building. The system has already been procured and delivered and IT Services will start to deploy this once all the significant remaining building work is complete and the priority areas of the main IT Network are ready.

It’s hard to convey the scale of all this work to a non specialist. When talking to colleagues in the Library, I was interested to hear them refer to “kilometres” as a measure of how many books they were moving. That’s a great measure and something that you can visualise. I wonder what the IT equivalent is – kilometres of networking cabling? Or alternatively who can suggest how many kilometres there are in a terabyte?

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s